Showing posts with label 60th. Show all posts
Showing posts with label 60th. Show all posts

Friday, August 21, 2009

After putting a new stem band on "the 60th" today, we brought down one of the three Kildonan canoes that are sitting in the dinning hall rafters. This canoe is a beast! In fact it is so big that it does not fit on the current canoe racks that we have. So right now it is on a couple of saw horses.
After putting it in the water for a while we saw that it had a heavy leak at the bow and a small leak at the stern, both where the keel is pealing away from the hull. Other than this, the canoe is in relatively good shape. Tomorrow I'm going to lift the keel off and run a bead of marine grade silicone and secure the keel back down. We'll see if that does it. Maybe we can get some campers taking it on trip on Sunday!
I'll add some pictures tomorrow.

Sunday, August 16, 2009

The Final Product at the End of the Week

So at the end of the week, we have 4 canoes done. Two will be in service after the paint has a day or two to dry and the other two are 'in the rafters' waiting for the filler to cure. With 'Grace' being returned to the camp by Doug Ingram this year and another going home with him for restoration over the winter, Pioneer Camp will have at least 6 cedar and canvas boats on the water next season

The End of the Week Long Marathon

The survey of Pioneer Camps's wood and canvas canoes identified 4 boats that could be returned to service with only minor repairs and refinishing. This last week was spent getting these canoes ready for next year. It also gave camp staff and opportunity to learn some of the skills necessary to maintain their fleet. Chris Milne has started to develop a log of the work done on each boat and a schedule of future maintenance so that this can be worked into the camp's overall plan. This last process is perhaps the most important in the success of the overall program. Hopefully, the log will start to include the history and stories associated with each boat as well.


The first canoe was the '60th Anniversary' Jamie Thompson. It was fully restored by Doug Ingram in 2002 and only needed some minor repairs to the canvas and repainting. However, to save the original artwork done by Doug ment masking the details which took a couple of hours. Unortunately, cracks in the paint where the canvas meets the outwale has allowed water to get in and begin to rot the canvas. This boat will probably need to be recanvased in a couple of years but it is structurally sound. After a new coat of paint and reinstallation of the stem bands, it is ready to go back into service.








The second canoe was another Jamie Thompson that had been restored recently. The structure and canvas were reasonably sound but it needed a one broken rib repaired (3 breaks in one rib!), minor filling of scratchs and gouges in the canvas, and repainting. This is pretty typical work for camp boats and will become an annual process for staff at the beginning of each season. The work on this boat gave staff the chance to work through basic sanding, filling and painting. The canvas is in reasonable shape and should last for at least a couple more years. During the future recanvasing the broken rib should be replaced. As is usually done, the stem bands were removed for refinishing and reinstalled with fresh silicone sealant. Some of the screw holes needed filling in order to give the screws some 'bite' but this is to be expected. Chris Milne had a chance to see how good a paint job he could do. Of course, after painting there was a couple of hours of picking wayward bugs out of the fresh paint.



The third boat was yet another Jamie Thompson that need a little more TLC. A couple of years ago, someone had begun a restoration. The inside had been refinished and new canvas installed. The canvas needed to be re-stretched before filling and during this process, we discovered the ends of the inwales, tops of the stem, and tips of the decks showed the beginnings of rot. A careful application of epoxy and then thickend epoxy was applied and this should stabilize further deterioration for a bit. Ultimately, this problem will need proper attention. Almost all of Pioneer Camp's canoes have some rot at this critical structural point. As the whole fleet comes back into service, each canoe will have to be rebuilt at this point. Fortunately, a new storage plan is in the works which should reduce this deterioration in the future. Once the stem repairs were made and the canvas restretched, it was filled. Young Shawn Deerborne spent most of one afternoon helping with this process. The filler now has to sit for 3 to 4 weeks to fully cure before sanding and painting.






The final canoe was the most challenging. It is a Chestnut, perhaps a Pal, but is interesting in that it has a mast thwart and in fact the camp has the orginal centerboard thwart and mast. They may actually integrate this boat into their advanced sailing program. The canoe required repair to one one rib, some repairs to planking, sanding and refinishing the interior and outwales, recanvassing, and filling. Camp staff and campers came in to help as time allowed and by the end of the week, the canoe was in the rafters with the Jamie Thompson, waiting for the filler to cure. It will be back in active service in the spring.













Saturday, August 15, 2009

This is the first canoe that I restored for MPC. It so happens that it returned to camp during the 60th anniversary celebrations, and since then has been referred to as "The 60th".

It was with this canoe that I really started thinking about our role as stewards of these canoes, their role in facilitating our oral history, and how we can individualize the canoes to aid our memories. It was with this in mind that I decided to do this two tone paint job and to add the pin striping. Mark Barkey was doing some intern work with me that winter, so I drew upon his sign painting experience and asked him to paint "Manitoba Pioneer Camp" along the side, just under the gunnel. This is the first canoe that I am aware of, that is labelled as camp's.

This is one of the Jamie Thompson canoes.